Understanding the Power Challenge Behind AI Data Center Expansion
As AI data center capacity continues to expand, infrastructure planners face a recurring question: which backup power approach can scale alongside rising compute density without forcing a redesign of the entire power architecture. Critical power and energy infrastructure projects increasingly demand more than individual battery products. They require safe, efficient, low-carbon power supply and distribution systems, technical capability, large-scale supply capacity, long-term service, and regional delivery support across borders. This is the exact gap that Shenzhen Center Power Tech Co., Ltd., operating under the Vision Battery and Vision Group brands, has built its product and service matrix around.
A Diversified Technology Foundation Built Over 32 Years
Founded in 1994 in Shenzhen, China, Vision Battery has developed a diversified battery technology foundation spanning lithium batteries, lead-acid batteries, hydrogen fuel cells, and sodium-ion batteries, with a solid-state battery added to the portfolio in 2025. This breadth matters for scalability because it allows technology selection matched to application requirements and customer investment priorities across backup power, energy storage, and new energy applications, rather than forcing every project into a single chemistry.
The company operates five global R&D and manufacturing bases and an international branch network across Mainland China, Hong Kong, Vietnam, Singapore, India, France, Germany, and the United States, supported by overseas dual-base production. Annual production capacity exceeds 12 GWh, backed by more than 1,000 patents and a workforce of 3,000+ employees.
REVO TP High-Power UPS Battery Systems
For AI data centers specifically, the REVO TP portfolio—comprising the TPX, TP, TPH, and TPL series—covers 40 kW to 600 kW per configuration, giving planners a range to match UPS power requirements as compute clusters grow. The flagship TPX600, launched in 2024 as UPS REVO 3.0 TPX600, delivers up to 600 kW per cabinet with discharge capabilities up to 10C continuous and 30C pulse. A 1.2 MW UPS configuration can be achieved using only two cabinets, reducing equipment footprint in space-constrained facilities. Active balancing and liquid cooling support battery consistency, while a 10-layer safety design provides protection from cell and module levels through electrical isolation and fire suppression. An intelligent BMS handles SOC/SOH monitoring, temperature tracking, alarms, and lifecycle management, and communication via Modbus TCP, Modbus, and Redfish enables coordination with UPS, DCIM, and EMS platforms.
Energy Storage Systems That Extend Beyond Standby Protection
Scalability also depends on how backup capacity interacts with broader energy strategy. Vision Battery’s energy storage lineup—including the 314Ah and 628Ah energy storage cells launched in 2024, the 6.48MWh liquid-cooled energy storage system launched in 2025, the 241 kWh immersion liquid-cooled integrated unit, and the 5 MWh liquid-cooled storage cabin—combines reserved backup capacity with energy storage functions. Depending on project configuration, these systems support backup power, peak shaving, dynamic capacity expansion, green power integration, and grid interaction, which broadens the value of battery investment beyond simple standby protection.

800V HVDC Systems Aligned With Emerging AI Power Architectures
High-voltage DC architecture is an area of active development for hyperscale AI facilities, including directions aligned with NVIDIA’s 800 VDC ecosystem. Vision Battery’s 800V DC Direct-Connect Storage-Backup System achieves direct-connect system efficiency of 92% or higher, supports full outdoor deployment with IP55 protection, and uses semi-immersion liquid cooling for thermal management. This system combines backup with energy dispatch in one platform, offering an option beyond conventional UPS-based configurations. A complementary 800V HVDC Dedicated Backup Platform is identified for 2026 release, intended for projects where dedicated backup—rather than storage-backup integration—is the primary requirement. On January 18, 2026, the Ulanqab 800V HVDC storage-backup integrated system completed grid connection and commissioning, applying semi-immersion liquid cooling and full outdoor deployment for a hyperscale AI data center.
Prefabricated Deployment for Phased Capacity Planning
Large AI campuses often expand in phases rather than all at once. The planned PTU Prefabricated Cabins, covering 1.8 MW–3.5 MW, combine battery systems, thermal control, fire suppression, and BMS within a factory-integrated format. This reduces on-site assembly scope and supports modular expansion around different construction phases, which is relevant for site-constrained AIDC development.
Delivery Capability Demonstrated at Project Scale
Scalability claims carry more weight when supported by documented deployment references. Vision Battery’s project record includes the Malaysia BDC data center, where 448 REVO TP200 units delivered 112 MW of backup capacity in a 10-minute BOL configuration, commissioned in 2023. Other references include EPLDT, with 439 battery racks providing 109.75 MW; Mercury, with 520 racks providing 130 MW, delivered in 2024; the GDS Hong Kong campus across HK1, HK2, and HK3, with 384 racks providing 96 MW, commissioned in 2024; and Malaysia PDG, with 396 racks providing 99 MW, commissioned in 2024. The S-BANK financial data center project used 216 battery racks to deliver 54 MW, completed in 2024. In rail transit, the Singapore MRT C190 project deployed a REVO TP200 solution with 10 battery racks providing 2 MW of backup capacity, commissioned in 2023. These projects span Asia, Europe, and Latin America, reflecting business presence in 100+ countries and regions and more than 800 professional energy solutions delivered to date.
Market Recognition and Technology Partnerships
Vision Battery’s position in the sector is reflected in stated market positions, including No. 1 global market share in the LFP battery UPS sector and No. 1 market share in LFP batteries for the overseas telecom industry, alongside No. 1 VRLA battery exports for 10 consecutive years. The company has also been recognized in rankings such as the 2025 Global New Energy Enterprise 500, the 2025 Shenzhen Enterprise 500 (ranked 252), the 2025 Hydrogen-Electric Industry TOP50, and the 2023 Gaogong Energy Storage TOP50 Enterprise, and it holds National High-Tech Enterprise and National Specialized and Innovative Little Giant Enterprise designations.
On the ecosystem side, communication options including Modbus TCP, Modbus, and Redfish support coordination with UPS, DCIM, and EMS platforms, and partnerships with Vertiv, Schneider Electric, Eaton, Socomec, and Delta connect Vision Battery’s capabilities with existing UPS and power infrastructure equipment—an important consideration for operators integrating new backup systems into established facilities. The company was also recognized with the 2023 Schneider Electric Outstanding Partner designation. Beyond direct commercial activity, Vision Battery has contributed to industry standards development, including a virtual power plant operation group standard and an electrochemical energy storage power station safety acceptance group standard, both published and implemented, with a computing center energy storage standard currently at the public comment stage.
A Portfolio Built for Current Deployment and Future Expansion
Taken together, the combination of a diversified chemistry base, power systems ranging from 40 kW to 600 kW per cabinet, energy storage units up to 6.48 MWh, emerging 800V HVDC architecture, prefabricated deployment formats, and a documented project delivery record positions Vision Battery as a supplier capable of supporting both current deployment and future expansion needs for AI data center infrastructure. For operators evaluating backup power strategies that must scale with compute growth while remaining compatible with existing UPS, DCIM, and EMS ecosystems, this breadth of technology and project experience is a relevant factor in long-term infrastructure planning.
https://www.vision-batt.com/en
Shenzhen Center Power Tech Co., Ltd.
More Stories
Why Axisymmetric Free-Piston Stirling Cryocooler Design Matters for Optical Systems
How Electrical Load Planning Influences Transformer Selection
How to Ensure Quality in Heavy Steel Fabrication: A Factory Insight